26851 Grayslake Rd., Rancho Palos Verdes, CA — $1,688,000

Questions about 26851 Grayslake Rd.

Listing information updated October 7, 2018

How many bedrooms does 26851 Grayslake Rd. have?

26851 Grayslake Rd. has 3 bedrooms.

How many bathrooms does 26851 Grayslake Rd. have?

26851 Grayslake Rd. has 2,3/4 bathrooms.

How big is 26851 Grayslake Rd.?

26851 Grayslake Rd. is approximately 2,344 square feet.

What is the price of 26851 Grayslake Rd.?

26851 Grayslake Rd. is listed at $1,688,000.

Is 26851 Grayslake Rd. still available?

As of October 7, 2018, 26851 Grayslake Rd. is an active listing. Contact the listing agent to confirm current availability.

When is the open house at 26851 Grayslake Rd.?

Open house at 26851 Grayslake Rd.: Sunday, Oct. 7 1-4 PM; Tues., Oct. 9 11 am-1:00 pm.

What features does 26851 Grayslake Rd. offer?

Notable features of 26851 Grayslake Rd. include 2017 New Construction, Beautiful city light views, Hardwood flooring throughout, Vaulted ceilings, All new plumbing, electrical and HVAC, Energy efficient and smart home equipped, Recessed LED lighting with dimmers throughout, tamper resistant outlets with USB ports, Private grass yard with room for a pool..

What parking does 26851 Grayslake Rd. have?

Parking at 26851 Grayslake Rd.: Car Parking.

How do I schedule a showing of 26851 Grayslake Rd.?

Contact listing agent THE TYNDALL TEAM, or use the contact form on this page. The listing's AI assistant can also answer questions and help arrange a showing 24/7.

What should buyers ask about a newly built home in Rancho Palos Verdes, CA?

Get the builder warranty terms in writing (what's covered in years one, two, and ten), have an independent inspection done even on new construction, and confirm what's actually included versus model-home upgrades. Ask about HOA formation and who controls it until build-out.

Do new-construction homes need an inspection?

Yes — independent inspectors routinely find issues in brand-new homes, from flashing and grading to HVAC installation. An inspection before the builder's warranty walkthrough gives you a documented punch list while fixes are still the builder's responsibility.